2019-2020 Projects
(In collaboration with Başkent Industrial Zone)
Group |
Company |
Topic |
1 |
AZP |
Material requirements planning and inventory tracking for AZP Transformer Co. Ltd. |
2 |
MEKA |
Material classification and inventory management system |
3 |
MERİH ASANSÖR |
Aggregate production planning |
4 |
TEKNOMAK |
Flexible job shop scheduling system with multiple projects |
5 |
SEMIX-1 |
Development of inventory tracking and control system |
6 |
NURİŞ |
Developing a system similar to the ERP module using simulation models for due date estimation |
7 |
MUTAY |
Waste elimination with value stream mapping method for Mutay Enerji |
8 |
AKANA |
Improvement of toolroom processes for Akana Engineering |
9 |
DOĞAN YILDIZ |
MRP-II preparation for Doğan Yıldız |
10 |
BAŞÖZ |
Galvanizing capacity planning |
11 |
SEMIX-2 |
Activity based costing |
12 |
GEOSONDAJ |
Cost analysis for core drill |
2018-2019 Projects
(In collaboration with Başkent Industrial Zone)
Group |
Company |
Topic |
1 |
AKANA |
Flexible job shop scheduling with setup times and precedence relations |
2 |
TEKNOMAK-1 |
Warehouse and inventory management system design |
3 |
MERİH ASANSÖR |
Logistics planning |
4 |
GEOSONDAJ |
Cost analysis for deep core drilling machine |
5 |
BAŞÖZ |
Order monitoring and delivering planning system at Başöz Enerji A.Ş. |
6 |
ATAK |
Developing a system for the project based working companies' due date estimation by using simulation models and by inspiration of ERP production modules |
7 |
TEKNOMAK-2 |
Paint shop scheduling for Teknomak |
8 |
YEPSAN-1 |
Improvement of uncertain product location in Yepsan S.S.H. |
9 |
DOĞAN YILDIZ |
Improvement of stock control at Doğan YILDIZ Ltd. Co. |
10 |
MUTAY |
Inventory management and control for Mutay Enerji Sistemleri |
11 |
GAYRET MAKİNA |
Developing a system for cost accounting by using inventory classification methods |
12 |
YEPSAN-2 |
Analysis and improvement of rework-based quality performance at Yepsan |
13 |
CEMATEK |
Order tracking and delivery planning system in Cematek |
14 |
ELİTE |
Production planning and scheduling system |
15 |
EPSİLON KOMPOZİT |
An approximate model for worker assignment for Epsilon Kompozit |
16 |
ANKASAN |
Cost analysis for Ankasan |
2017-2018 Projects
(In collaboration with Başkent Industrial Zone)
Group |
Company |
Topic |
1 |
GAYRET MAKİNA |
Designing stock management system similar to ERP modules and layout plan |
2 |
YÜKSEL KOMPOZİT |
Improvement of autoclave operations efficiency |
3 |
MEAL |
Developing a production scheduling system |
4 |
DOĞAN YILDIZ |
Development of production planning tool |
5 |
MERİH ASANSÖR |
Integrating maintenance-repair department and production planning department activities |
6 |
YEPSAN |
Continuous improvement in production and quality processes |
7 |
YÜKSEL KOMPOZİT |
Estimating kitting time and ergonomical improvement on the labeling software |
8 |
OPTİMA |
Designing alternative production lines |
9 |
MUTAY ENERJİ |
Decision support system design for delivery management system |
10 |
ANKUTSAN |
Warehouse organization and shipment planning |
11 |
DOĞAN YILDIZ |
Type-I assembly line balancing with station paralleling |
12 |
BAŞÖZ ENERJİ |
Production monitoring and scheduling system development |
13 |
PAYSA |
Investment analysis for the plasma cutting machine |
14 |
YEPSAN |
Heat treatment furnace scheduling |
15 |
SEM TRANSFORMATÖR |
Production planning and scheduling |
2016-2017 Projects
(In collaboration with Başkent Industrial Zone)
Group |
Company |
Topic |
1 |
AKO JANT |
Performance analysis and tracking system |
2 |
SEMİX |
Facility design |
3 |
CEMATEK |
Development of inventory management system and job scheduling |
4 |
OPTİMA |
Development of a production planning system |
5 |
BAŞÖZ ENERJİ |
Waste material minimization and layout design of black stock |
6 |
PAYSA |
Assembly line balancing |
7 |
GAYRET MAKİNA |
Developing an alternative system to ERP module for estimation of due dates using a simulation model |
8 |
ERTEM BASIM |
Determining box dimensions and quantities in a most economical way |
9 |
BAŞÖZ ENERJİ |
Welding workshop performance monitoring and scheduling system |
10 |
MERİH ASANSÖR |
Production process planning with delivery time estimation |
11 |
KAYMAKÇILAR |
Developing a costing system using ABC analysis |
2015-2016 Projects
Group |
Company |
Topic |
1 |
NETMON |
Warehouse design for Netmon's existing warehouse problem |
2 |
ULUSOY ELEKTRİK A.Ş |
Product grouping and demand forecasting |
3 |
SF ŞİRKETLER GRUBU |
Warehouse design |
4 |
EXPİNAL ALÜMİNYUM & PVC |
One dimensional cutting stock problem |
5 |
TERMİKEL A.Ş |
Stock control system |
6 |
SF GÜMRÜK MÜŞAVİRLİĞİ |
System improvement and performance measurement in customs services |
7 |
EB REBOSIO TÜRKİYE |
Facility design in EB REBOSIO |
8 |
ULUSOY ELEKTRİK |
Kanban system design |
9 |
LAZZONİ MOBİLYA |
Space allocation in LAZZONİ Warehouse |
10 |
T.C. BAŞBKANLIK AFET VE ACİL DURUM YÖNETİMİ BAŞKANLIĞI |
Storage and logistics problem of AFAD |
11 |
EB REBOSIO TÜRKİYE |
Production planning under mold availability constraints |
12 |
NURUS |
Development of inventory management system |
13 |
ERSA MOBİLYA |
Scheduling workstations by simulation models for organizing orders in ERSA MOBİLYA |
2014-2015 Projects
Group |
Company |
Topic |
1 |
ANADOLU EFES |
Product allocation in Anadolu Efes Ankara Warehouse |
2 |
ENERJİSA |
Detection of technical and nontechnical electricity losses |
3 |
AKSAPARK |
Inventory management and warehouse addressing study in Aksapark |
4 |
REBOSIO |
M-Stage hybrid flowshop scheduling for multiprocessing unidentical parallel machines with recirculating jobs |
5 |
MAN TÜRKİYE |
Scheduling of pipe workshop activities in MAN Türkiye |
6 |
ELFA METAL |
Developing a system based on genetic algorithm for incapability of due date estimation at Plusdoor |
7 |
MAN TİCARET |
Authorized service facility location problem for MAN truck & bus trade Inc. |
8 |
FIRAT MÜHENDİSLİK |
New facility design |
9 |
KROMLÜKS |
Analysis of cost effective utilization of the new laser cutting machine |
10 |
KAREL |
Lot sizing in Karel Electronics |
2013-2014 Projects
Group |
Company |
Topic |
1 |
EMEK Electrical Industry Inc. |
Effective scheduling |
2 |
AKSAN Steel Forging |
System improvement for minimizing the setup losses of press line |
3 |
ALTUNBİLEKLER |
Stock space planning in Altunbilekler's new warehouse |
4 |
ARÇELİK Dishwasher Plant |
Material handling |
5 |
COCA COLA |
Design of delivery between days and vehicle routing for Coca Cola İçecek |
6 |
AKSA PARK |
Standardization and documentation of processes for materials planning |
7 |
LAZZONİ |
Providing standardization in production processes and preparing
infrastructure of accurate planning |
8 |
ASSAN ASP Machinery |
Production planning |
9 |
AKYURT |
Stock planning |
10 |
GÜVEN Hospital |
A purchasing and inventory system design under depot capacity restriction |
11 |
DUŞ'AL |
Facility layout design |
12 |
DUŞ'AL |
Stock control planning |
2012-2013 Projects
Group |
Company |
Topic |
1 |
ALTUNBİLEKLER |
Vehicle loading and routing problem |
2 |
BOZANKAYA |
Statistical process control |
3 |
EGO |
Maintenance planning and monitoring |
4 |
EGO |
Transfer station location and route planning |
5 |
KROMLÜKS |
Cutting-stock problem |
6 |
MEGE TEKNİK |
Workforce planning and efficiency improvement |
7 |
PREKONS |
Production planning and scheduling |
8 |
SOYKANLAR |
Inventory control and order tracking system |
9 |
TAV Esenboğa - DHMİ |
Aircraft parking lot and gate scheduling |
10 |
TERMİKEL |
Scheduling problem |
11 |
ULUSOY ELEKTRİK |
Scheduling for moulds |
12 |
YDS |
Warehouse design |
13 |
YUNUS MARKET |
Vehicle loading and routing |
14 |
ZİRAAT BANKASI |
Location problem for new branches |
2011-2012 Projects
Group |
Company |
Topic |
1 |
KARBA |
One dimensional cutting-stock problem |
2 |
ALFER |
Production and capacity planning |
3 |
YİĞİT AKÜ |
Material handling and KANBAN implementation |
4 |
SOYKANLAR |
Vehicle routing and loading |
5 |
SERDAR PLASTİK |
Material handling system design |
6 |
TÜRK TRAKTÖR |
New facility design |
7 |
MAN A.Ş. |
Maintenance planning |
8 |
BOZANKAYA |
Scheduling of welding operations |
9 |
OPAL ON |
Facility layout planning |
10 |
YENİMAHALLE BLD. |
Investment planning for public park areas |
11 |
YENİMAHALLE BLD. |
Location-allocation problem |
12 |
GENPOWER |
Cost analysis |
2010-2011 Projects
Group |
Company |
Topic |
1 |
GENPOWER |
Inventory control and warehouse design |
2 |
ELFA |
Capacity planning and scheduling |
3 |
GÖÇMAKSAN |
Production planning |
4 |
HİDROAN |
Inventory control |
5 |
KARBA |
Facility layout planning |
6 |
MİKROMAK |
Materials requirement planning |
7 |
GENPOWER |
Assembly line balancing |
8 |
HİDROTORK |
Materials requirement planning |
9 |
TEKNİKON |
Facility design |
10 |
ÇANKAYA UNIVERSITY |
Design of transportation system |
11 |
ELFA |
Cost analysis |
12 |
BİRLİK MAKİNA |
Quality control system design |
13 |
PİMAKS |
Facility design |
2009-2010 Projects
Group |
Company |
Topic |
1 |
ELFA |
Development of aggregate production scheduling system |
2 |
SERDAR PLASTİK |
Warehouse design and storage assignment |
3 |
MAN A.Ş. |
Assembly line balancing |
4 |
SERDAR PLASTİK |
Scheduling of injection process |
5 |
KARDELEN MAKİNA |
Cost analysis |
6 |
ÇESAN |
Development of a material requirement system |
7 |
SEÇKİN MAKİNE |
Cost analysis |
8 |
PALME MAKİNA |
Facility layout improvement |
9 |
ÇELİKSAN DÖKÜM |
Cost analysis and estimation |
10 |
HIDROAN-TEKNOAN |
Cost analysis |
11 |
HIDROAN |
Layout design for a new facility |
12 |
ONİŞ İNŞAAT MAKİNELERİ |
Cost analysis |
13 |
ER MAKİNA |
Facility layout improvement |
2008-2009 Projects
Group |
Company |
Topic |
1 |
ÜN-KOÇ MAKİNA |
Decision support system implementation for order processing |
2 |
BİRLİK MAKİNA |
Aggregate planning using weighted distribution problem type linear programming model |
3 |
YILDIRIM MÜHENDİSLİK |
Process improvement and stock control |
4 |
YAVUZ MOTOR |
Supply chain design |
5 |
BİRLİK MAKİNA |
Facility layout improvement |
6 |
KARKE MAKİNA |
Cost analysis |
7 |
PALME MAKİNA |
Assembly line balancing |
8 |
TİPİSAN OTOMOTİV |
Product tracing system development |
9 |
PALME MAKİNA |
Trim-loss minimization management |
10 |
ASSAN ASP Makine |
Cost analysis |